Free bathroom remodel estimator
What will your bathroom remodel cost?
Choose your bathroom's size, finish level, and how much you're changing for an estimate built from current 2026 remodeling costs — before you call a single contractor.
What drives bathroom remodel cost
These factors move a bathroom remodel budget the most.
Layout changes
Keeping fixtures where they are is far cheaper than moving the toilet, tub, or sink, which means relocating plumbing.
Finish level
Stock vanities and basic tile cost a fraction of custom cabinetry, stone, and designer fixtures.
Size
A powder room costs far less than a large primary bath with a separate tub and shower.
Labor & region
Plumbing, tiling, and electrical labor make up much of the bill and vary sharply by market.
Bathroom remodel cost by finish level
Typical 2026 total cost for a standard full bath, before size and scope adjustments.
| Finish level | Standard full bath | What you get |
|---|
| Budget | $8,000–$15,000 | Stock fixtures, basic tile, keep layout |
| Mid-range | $15,000–$30,000 | Quality fixtures, tile, some upgrades |
| High-end | $30,000–$60,000 | Custom cabinetry, stone, premium fixtures |
Planning a DIY job?
Common materials and tools for this project. (Affiliate links — we may earn a commission at no cost to you.)
Bathroom remodel questions, answered
How much does a bathroom remodel cost in 2026?
A standard full bathroom remodel typically runs $15,000 to $30,000. Budget refreshes can start around $6,000–$10,000, while large or high-end primary baths can reach $40,000 to $60,000+.
What's the most expensive part of a bathroom remodel?
Labor and anything involving plumbing. Moving fixtures, relocating plumbing, and tiling are labor-intensive; keeping the existing layout is the single biggest way to control cost.
Does a bathroom remodel add value?
Mid-range bathroom remodels tend to recoup a solid share of their cost at resale, and updated bathrooms are among the features buyers notice most. Over-customizing for high-end taste recoups less.
How long does a bathroom remodel take?
A cosmetic refresh may take one to two weeks; a full remodel two to four weeks; a gut-and-reconfigure with plumbing changes can run four to six weeks or more.